NIT No./PR No. Business Tender Description Pre Bid Date Cost of EMD (Rs. Lakhs) Date of Advertisement Bid Submision Closing Date Tender Doc Corrigendum Status
IREP/SAUNDATTI/CIVIL AND HYDRO-MECHANICAL PACKAGE/002 Renewable Energy NIT For "Execution of Civil and Hydro-Mechanical Works on EPC Basis, along with complete detailed engineering for the project, Scope of work will include all Civil and H&M components of project i.e. Upper embankment dam, Lower embankment dam (to be included), bottom outlet at upper reservoir, Intake Structure, Intake Tunnel along with Steel Liner, Penstocks, vertical and horizontal Pressure Shaft along with Steel Liner, Surface Powerhouse, Tail Race Tunnel, Outlet structure, Tail race channel, Adits, Hydro-Mechanical Works (including Gates, Stoplogs, hoisting arrangements, Trash Racks & valves etc), all other Appurtenant Works required for completion of project, Infrastructure works along with review & interface of Electro-Mechanical Works, Fabrication, Erection, Testing, Commissioning and conducting Performance Guarantee Testing complete and handing over in all respects of "Civil and Hydro-Mechanical Works" on "EPC BASIS", remedying of the defects if any, and other activities incidental to the completion of Works for 1260 MW Pumped Storage Project 05th April’2021 1000 26th March’2021 30th August’2021 - - Live
IREP/SAUNDATTI/ELECTRO - MECHANICAL PACKAGE/001 Renewable Energy NIT For "
PACKAGE-A:
Electro Mechanical Equipment's from MIV to LV side of generator transformer, broadly consists of "Main Inlet Valve (MIV) and, its associated equipment, Pump- Turbine & Generator - Motor along with its Auxiliaries (2x126 MW & 4x252MW - Variable Speed Machines), Governors, AC Excitation System, associated LV and MV switchgear, Generator Circuit Breaker and Phase Reversal Isolators, current limiting reactors, isolated phase bus duct, Dynamic braking/starting switch, total plant SCADA, Instrumentation, Auxiliaries, Controls and Protection, Special interconnecting Cables & accessories in complete" including supply of Critical, recommended & mandatory spares.
PACKAGE-B:
Balance of Plant (E-BoP & M-BoP): 400 kV Pothead yard equipment-CT, PT, CVT, Lightening Arrestors, Wave Traps, Isolators, OPGW, PLCC/FOTE, MV & LV Switchgear Panels, Earthing System, FRLSH Cables (Power, control & Instrumentation with accessories), Cable Trays and Accessories, Auxiliary Station Transformers, Auxiliary Unit Transformers, CT's, LAVT, Battery System, Illumination System, HVAC System, including all associated Structures and accessories in complete, including Power Transformers, 400 kV GIS, EOT Cranes, Fire Protection, Detection and Firefighting system, DG Set (11kV, 1010 kVA) etc. with integration of system to plant SCADA for 1260 MW Pumped Storage Project
28th February’2020 1500 13th February’2020 19th January’2021 Bids Received - Closed
AP01 IREP/PINNAPURAM/ASSS/005 Renewable Energy NIT For "Construction of the Asphalt Surface Sealing System (ASSS) on rockfill Dams (AFRD), TRC and in Intake Areas (as shown on the corresponding drawings)/ includes placing and compaction of 2B filters, application of the prime and tack coat, placing and compaction of the layers of the asphalt surface sealing system, Bituminous coat. The Asphalt Concrete Contractor (ACC) shall properly backfill Mastic Pockets, embed the Copper Water Stoppers into the asphalt and place the Glass Grid. All joints shall be properly sealed and treated. The ACC shall provide sufficient adequate men, machinery, tools & tackles, equipment, handling, testing of material to satisfy the requirements given in the technical specifications and to reach the envisaged placing rate. Transportation of asphalt from the mixing plant to the placing unit will be done by the ACC 16th August’2021 - 23rd July’2021 30th September’2021 Click Here - Live
IREP/PINNAPURAM/CPSS PACKAGE/003 Renewable Energy NIT For "DESIGN, ENGINEERING, MANUFACTURE, SHOP TESTING, TRANSPORTATION, INSURANCE, SUPPLY, CONSRUCTION OF CIVIL WORKS, ERECTION, TESTING AND COMMISSIONING of 400/220 kV CENTRAL POOLING SUB-STATION" for Integrated Renewable Energy Project (IREP) 30th April’2021 150 07th April’2021 24th May’2021 Click Here - Closed